Nevada Street Bridge Design Options

On Thursday, April 28, 2016 the Ashland Transportation Commission will present to the public three design options for the Nevada Street Bridge project.  The Commission will take public testimony on the project. 

The meeting is scheduled from 6:00 8:00 p.m. in the Council Chambers, located at 1175 East Main Street.

For more information contact 541-488-5347.

The Nevada St. bridge project was identified as a priority project in the 1998 Transportation System Plan (TSP) and also the 2012 TSP. The project has been estimated to cost $5.481 million dollars. The City has received $1.5 million in funding through a surface transportation grant (STP) for the project to date. The grant funding is available in October of 2016 and city staff expect engineering, permitting and construction of the project to take at least 3 years.
 
The project consists of roadway, sidewalk and bike lane improvement along east and west Nevada St. along with construction of a bridge over Bear Creek.

The connection serves multiple purposes. First it creates a multimodal east west connection for Nevada St.  The project will also serve as the Greenway connection as the Greenway expands towards east Ashland in the future. In addition, this connection was identified in the TSP as a future RVTD internal circulator route for Ashland.
 
Link to current TSP documents: http://www.ashland.or.us/Page.asp?NavID=13455
 

NEVADA STREET BRIDGE DESIGN OPTIONS.PDF (5197.6kb)
Three design options for the Nevada Street Bridge

Ashland 24/7

Pay Your
Utility Bill
Connect
to AFN
Request Conservation
Evaluation
Proposals, Bids
& Notifications
Request Building
Inspection
Apply for
Building Permits
Apply for Other
Permits & Licenses
Register for
Recreation Programs

©2017 City of Ashland, OR | Site by Project A

Quicklinks

Connect

Share

Email Share