• 2012 Comprehensive Water Master Plan
• 2006 Water Supply System Master Plan Update, Tech. Memos 1-4
• 2006 Crowson II and Ashland Loop Road Reservoir Siting Study
• 2017 Siting Study Technical Memorandum
• 2017 Water Quality Analysis and Treatment Process Selection
• 2017 Talent Irrigation District (TID) Pipeline Repurposing Evaluation
• 2017 TID Water Quality Analysis
• 2018 Summary Report Direct Filtration Membrane Pilot Study