Call to Order
The meeting was called to order at 8:1 5 a.m.
Approval of Minutes
Minutes of the August meeting were approved M/S Bussell/Pugh.
Letter to City Attorney and City Recorder
The draft letter regarding AMC 2.10.040 was approved M/S Bussell/Garington.
Gallery Guide
Garrington volunteered to draft the article for the Gallery Guide with emphasis on public art for Fire Station No. 2 and the Plaza.
Update Fire Station No. 2
Seltzer, Fire Chief, project manager and contractors for Fire Station No. 2 had a conference call with artist CJ Rench to discuss the pedestal for Open Minded. The pedestal will be 18 inches tall and approximately 4 to 5 feet in circumference. Rench will provide engineering drawings to the contractors within the next four weeks. The cost is estimated at approximately $3,000 to be paid through the public art fund.
Plaza
Artist Sue Springer presented her concept for public art on the Plaza. The art will be a combination of tile and mosaic in muted blues, greens, and yellows set in a wavy pattern on the face of the seat walls. The concept was approved by the commission M/C Davis/Bussell.
Springer will meet with Covey Pardee Landscape architects on Wednesday September 26.
The PAC agreed that a direct commission to an artist (Sue Springer) was the only way to meeting the city’s timeline for the Plaza project and incorporate the public art installation into the construction documents.