City of Ashland, Oregon / City Recorder / City Council Information / Packet Archives / Year 2002 / 11/05 / Elec Fees
Elec Fees
[ Council Communication ] [ Proposed
Resolution ]
Council Communication
| Title: |
A Resolution Adopting a New Fee Schedule for the
City of Ashland Building Division Electrical Inspection Program |
| Dept: |
Department of Community Development |
| Date: |
November 5, 2002 |
| Submitted By: |
Mike Broomfield, Building Official
John McLaughlin, Director of Community Development |
Reviewed
By:
........................ |
Brian Almquist, Interim City Administrator |
| Synopsis: |
The City of Ashland has provided the Electrical
Inspection Program since 1989. Fees for the program have never been raised
since its inception, and are the lowest in Jackson and Josephine counties.
The Electrical Inspection Program is currently operating at a deficit. Recent
action by the Council to amend the structural valuation table has not affected
electrical fees since these fees are not based on estimated or calculated
construction values. Staff is proposing a new fee schedule increasing fees
by approximately 25%. |
| Recommendation: |
Staff recommends that Council approve the attached
resolution adopting a new fee schedule for the Electrical Inspection Program.
This will effectively increase fees within this program by approximately
25%. |
| Fiscal Impact: |
The Building Division is supported by fees associated
with permits and inspections. The direction from the City Council is for
this division to be self-supporting through the collection of these fees.
This increase will ensure that the Electrical Inspection Program is adequately
supported by fees. |
| Background: |
As stated, the City of Ashland has been the Authority
Having Jurisdiction for electrical inspections since 1989. The program has
been administered by the Building Official as an additional duty. A second
electrical inspector for one and two family dwellings was added to deal with
the volume in this sector of development. Recent construction has concentrated
in commercial and institutional development and has required significant
plan review time not required for residential reviews. This increase in time
for inspection and approval has resulted in this portion of the Building
Division operating at a deficit. The proposed fee schedule is designed to
alleviate the deficit situation. |
End of Document - Back to Top
RESOLUTION NO. 2002-_____
A RESOLUTION ADOPTING A NEW FEE SCHEDULE FOR THE CITY OF ASHLAND BUILDING
DIVISION ELECTRICAL INSPECTION PROGRAM.
THE CITY OF ASHLAND RESOLVES AS FOLLOWS:
SECTION 1. The Electrical Inspection Program Fee, marked as Exhibit "A",
is adopted.
SECTION 2. The new fee schedule shall become effective December 1, 2002.
This resolution was read by title only in accordance with Ashland Municipal
Code 2.04.090 and duly PASSED and ADOPTED this 5th day of November,
2002.
Barbara Christensen, City Recorder
SIGNED and APPROVED this _____ day of _______________, 2002.
Alan DeBoer, Mayor
Reviewed as to form:
Paul Nolte, City Attorney
EXHIBIT "A"
City of Ashland Building Division
Electrical Inspection Program Fee Schedule
A. New Residential-Single or Multi-Family per dwelling unit
1000 Sq. ft. or less $106.00
Each additional 500 sq.ft Or portion thereof $ 19.00
Limited Energy:
1 & 2 Family Residential $ 25.00
Multifamily Residential $ 45.00
Each Manuf'd Home or Modular Dwelling Service Or Feeder $ 50.00
B. Service or Feeders
Installation, Alterations, or Relocation
200 amps or less $ 63.00
201 amps to 400 amps $ 75.00
401 amps to 600 amps $125.00
601 amps to 1000 amps $163.00
Over 1000 amps or volts $375.00
Reconnect Only $ 50.00
C. Temporary Services or Feeders
Installation, Alterations or Relocation
200 amps or less $ 50.00
201 amps to 400 amps $ 69.00
Over 401 amps to 600 amps $100.00
Over 600 amps or 1000 volts see "B" above
D. Branch Circuits
New, Alterations or Extension Per Panel
a) The fee for branch circuits with purchase of service or feeder fee
Each branch circuit $ 3.00
b) The fee for branch circuits without purchase of service or feeder fee
First branch circuit $ 43.00
Ea. Additional branch circuit $ 3.00
E. Miscellaneous (Service or Feeder Not Included)
Each pump or irrigation circle
Each sign or outline lighting
Signal circuit(s) or a limited energy panel,
Alteration or extension $ 50.00
F. Each additional inspection
Over the allowable in any of the
Above, per inspection $ 44.00
EXHIBIT "B"
System Development Charges Schedule for Parks
Previous Parks SDC (since 1997) New Parks SDC (effective Jan.1, 2001)
Single Family $1,199 $1041.20
Multi-Family $938 $814.86
Tourist Room $748 $487.76
End of Document - Back to Top
|