| Tent Rental Charge - Cemetery Division |
$50/day |
| • |
The cost is based on delivery, set up and removal. |
|
| - |
|
|
| Grave Setup Rental Charge- Cemetery Division |
$100/occurrence |
| • |
The cost is based on the use of grave pads, lowering device, chairs, and greenery used by funeral homes. |
|
| - |
|
|
| Vault Charge- Cemetery Division |
$1,050/occurrence |
| • |
The cost is based on the price of the vault. |
|
| - |
|
|
| Administrative Fee for Vehicles Impounded by Police |
$105/occurrence |
| • |
The cost is based on staff time for Patrol, Dispatch, and Records at $97.84 and materials at $6.94 |
|
| - |
|
|
| Water Chlorination test - subdivision retest upon failure |
$500/retest |
| • |
The cost is based on time and materials. |
|
| - |
|
|
| Water Pressure test - subdivision retest upon failure |
$500/retest |
| • |
The cost is based on time and materials. |
|
| - |
|
|
| Water Main Line Tap - up to a 6 inch waterline |
$1500/tap |
| • |
The cost is based on time and materials. |
|
| - |
|
|
| Water Main Line Tap - above 6 inch waterline |
$2000 minimum/actual cost |
| • |
The cost is based on time and materials. |
|
| - |
|
|
| Sewer line video inspection - subdivision |
$250 minimum/inspection |
| • |
The cost is based on time and materials. |
|
| - |
|
|
| Electric system engineering fee up to 20 lots (single-phase meter) |
$120/lot |
| Electric system engineering fee - 21 or more lots (three-phase meter required) |
$180/lot |
| Electric Commercial |
$225 minimum |
| • |
See attached supplemental documents |
|